Competitions Undertaken: | The 6th Tianjin East Asian Games 2013 /The 13th National Games 2017 |
Project Location: | Tianjin |
Site Area: | 47,970㎡ |
Building Area: | 37,002㎡ |
Building Height: | 31m |
Building Storey: | 4 floors above ground, 1 floor underground |
Seating Amount: | 3,430 seats |
Partner: | OVE ARUP PTY LTD |
Designed/completed: | 2004/2011 |
The aquatic centre follows the principle of “Three dewdrops” in the overall planning of the Olympic Centre, and, themed by water drops, it joins hands with the gym and the stadium to create the beautiful layout of three dewdrops dotted on the water surface, implying the ideal of the return of mankind to nature.