Project Location: | Harbin, Heilongjiang Province |
Building Area: | T1: 6,7000㎡, T2: 13,5000㎡ |
Client: | Heilongjiang Airport Group Management Group |
Partner: | CAFUC |
Designed/completed: | 2010/2020 |
Harbin Taiping International Airport is 30km away from downtown Harbin, and the newly-built terminal occupies an area of about 120,000㎡ and adopts the finger pier configuration to ensure the airside operation space.
Terminal T1, based on the modeling of Terminal T2, is comprehensively renovated following the overall pattern of a beautiful snowflake flying in an immense forest, which perfectly embodies the inner romantic charm of the city’s ice and snow culture.
The newly-built terminal provides 21 close spots (16C4D1E), so, combined them with the 14 close spots (5C6D3E) of the renovated old terminal, there are a total of 35 close spots.