Project Location: | Chongqing |
Building Area: | Gross area of station building 79, 945㎡; reserved commercial area 11, 100㎡ or so; underground vestibule 10, 316㎡; platform area of station building 898.6㎡ |
Client: | Chengdu Railway Bureau |
Partner: | China Railway Eryuan Engineering Group Co., Ltd. |
Designed/completed: | 2010/ |
The newly-built north level parallel station building and elevated overcrossing station building in the project are combined with original south station building into the new Chongqing North Railway Station, and on the whole it adopts the basic form of combining the elevated railway stations of north and south station buildings and the elevated driveway in front of the station.