• Group members
  • Products

    Residential

    Urban Complex

    Office

    Tech Park

    Transportation

    Sports

    Hospitality

    Integrated Resorts

    Health Care

    Culture

    BIM Consulting

    R.O.C.H.

    Government

    Hotel MEP

    Station

    Transit Hub

    TID Consulting

    Energy Center

    Metro Complex

    PLANNING

  • Services

    Architecture

    Structure

    M&E

    Planning

    PM

    BIM

    Sign Design

    Techno-Economy

    Landscape

    Sustainability

    Curtain Wall

    Health Care GMP

    General Drawing

  • Projects
  • Press
  • Careers
  • About
Language
Suzhou Logistics Centre Service Zone Office Building
As a one-stop service office building and the first green three-star office building seated in Suzhou Industrial Park (SIP), SIP Comprehensive Bonded Zone consists of office buildings, exhibition halls, business restaurants, garages, activity rooms, small-sized shops and many other multi-functional office facilities.
Project Location: Suzhou Industrial Park
Building Area: 74,763㎡
Partner: GPW

CCDI provides design general contracting and whole-process electromechanical consultation & design services, and its total energy consumption is lower than 80% of the national energy-saving standard.
Main technologies adopted:
Thermodynamic engineering performance optimization of enclosure structures;
Adjustable external sun-shading devices;
Recovery and utilization of rainwater and reclaimed water;
Adoption of ice storage as air-conditioning cold source, and use of water thermal storage as air-conditioning heat source, with investment payoff period of 4.8 years and annually-saved operating cost of 480,000 RMB.
Adoption of the total heat recovery technology for all fresh air volumes;
Intelligent monitoring and unit linkage technology;
Control of fresh air and exhaust volumes based on indoor CO2 concentration;
Adoption of variable air volume (VAV) air-conditioning system in the office area;
Use of underfloor air distribution system;
Control of the start/stop of garage exhaust based on CO concentration;
Use of high-efficiency water pumps and fans.

CopyRight @2014 CCDI All rights reserved.
沪ICP备09084688号